Login | Register
產(chǎn)品中心
Home > Products > Screw pumps > Long lead screw pump
view  
 
A Long Lead Screw Pump is a high-performance positive displacement pump designed for the precise and efficient transfer of viscous, abrasive, and shear-sensitive fluids in demanding industrial applications. Featuring an extended lead screw and rotor-stator mechanism, this pump provides continuous, low-pulsation flow while handling large volumes with minimal energy consumption. Its long lead design ensures smooth and stable operation, making it ideal for industries such as chemical processing, food and beverage, pharmaceuticals, oil and gas, and wastewater treatment. The Long Lead Screw Pump excels at pumping high-viscosity liquids, pastes, and slurries, including oils, resins, adhesives, syrups, and sludge, without causing shear damage or compromising product quality. Constructed from durable, corrosion-resistant materials, it offers excellent wear resistance, long service life, and reliable performance even under harsh conditions. The pump’s robust yet compact design allows for easy installation, maintenance, and integration into automated production systems, reducing downtime and operational costs. With strong suction capabilities, high efficiency, and energy-saving performance, the Long Lead Screw Pump is suitable for continuous, precise, and hygienic fluid transfer, providing a versatile and dependable solution for modern industrial processes requiring consistent flow, accuracy, and durability.
  • Long lead screw pump

    Long lead screw pump

    The Long Lead Screw Pump is a specialized positive displacement pump designed for efficient transfer of highly viscous, abrasive, and particulate-laden fluids. Distinguished by its extended lead rotor, this pump delivers steady, non-pulsating flow over long distances and is ideal for applications requiring consistent metering, high pressure, or precise dosing.

    Send Inquiry

This website uses cookies to ensure you get the best experience on our website.

Accept Reject
辽中县| 墨玉县| 富顺县| 桂阳县| 牟定县| 乌拉特后旗| 乾安县| 射洪县| 大丰市| 西畴县| 丹阳市| 惠安县| 上林县| 邢台市| 扬州市| 香港 | 丹江口市| 青神县| 岚皋县| 金门县| 阿合奇县| 阜新| 普安县| 宁德市| 灌阳县| 托克托县| 都安| 惠水县| 准格尔旗| 利津县| 蒲城县| 昌平区| 中卫市| 阳原县| 阳曲县| 南召县| 若羌县| 东安县| 双鸭山市| 定州市| 德安县|